Description
Method of Application:
Surface preparation
- Make sure that the surface is absolutely clean, dry and free from dust, grease and foreign materials.
- There should be a time gap of at least 10 days before MCON SUPER COAT application is done on newly plastered surfaces.
- Ensure that the surface is fairly even
- If concrete surface is to be painted, it shall be washed with a water jet at 3000 psi and all loose concrete should be getting removed and all pin holes and blow holes should get opened.
