Description
Areas of Application
- Column
- RCC & PCC – Any filling & levelling works
- Floorings, Terrace Waterproofing works
- Any other simple Concrete works
- Damp-Proof Course (DPC)
Instructions for use
- The content of the bag can be mechanically mixed in a free fall mixer for 3-4 minutes or by hand mixed by passing the contents in the tray.
- Take approximately 10 – 15 of clean water. Slowly add water and mix it continuously until the desired workability is achieved.
- This concrete should be used within 40 to 50 min of water addition.
- There is no need to add further additives or admixture to the material on site as required plasticizers and workability aids are already incurred in the mix.
